Concrete Slab Cost Calculator

This concrete slab cost calculator doubles as a concrete pad cost calculator. It prices a flat rectangular pour from its three dimensions: patio, shed base, garage floor, or hot tub pad.

Free · Instant results as you type · No sign-up

1Dimensions

4 in for patios and walkways, 5 to 6 in for driveways.

2Waste allowance

%

Pros order 5 to 10% extra for spills, over-excavation and uneven subgrade.

3Material and cost

Choose how your quote is priced, then fill in that one price below.

Delivered ready-mix commonly runs $150 to $200 per yard before fees. Leave at 0 to skip cost.

Used only with the per-bag pricing basis. Bags commonly run $5 to $8 each.

Used only with the installed pricing basis. It covers concrete, labor and finishing.

Live preview

12 ft12 ft4 in

Your estimate

Updates as you type
Estimated material cost$332.44
Order this (rounded up)2.00 yd³Plants sell concrete in quarter-yard steps, so this rounds your figure up.
Volume (cubic feet)52.80 ft³
Volume (cubic meters)1.50 m³
Footprint area144.0 ft²
Waste amount0.18 yd³
80 lb88 bags
60 lb118 bags
50 lb141 bags
40 lb176 bags
Weight (at 150 lb/ft³)7,920 lb

Includes a 10% waste allowance on top of the exact geometric volume (1.78 yd³). Bag counts are rounded up, because you cannot buy part of a bag.

Enter length, width, and thickness, then set your local ready-mix price per cubic yard. The calculator returns the yardage with waste, the material total, and the bagged pre-mix cost for the same slab. You can compare the two options honestly.

Slab cost surprises usually come from two places. The first is thickness: going from 4 in to 6 in raises the concrete bill by 50% on the same footprint.

The second is load size: slabs under about 4 cubic yards trigger a short-load fee, which can add $40 to $100 to a small order. Both effects are visible here before you commit to a delivery or a pallet of bags.

How This Calculator Works

Volume is length × width × thickness with thickness converted from inches to feet, divided by 27 for cubic yards. The calculator adds your waste percentage before pricing, and 10% is a sound default for formed residential work.

The plant bills you for what leaves the yard, not for the exact geometry of your forms. The calculator multiplies that billed yardage by your price per yard and adds any delivery or short-load fee you enter.

The bag comparison uses standard pre-mix yields: an 80 lb bag makes 0.60 ft³ of placed concrete, a 60 lb bag 0.45 ft³. Dividing the slab's cubic feet (including waste) by 0.60 gives the 80 lb bag count.

Bags carry no delivery minimum, so they win on tiny pours. But someone must lift, mix, and place each bag by hand. At $5.50 a bag, the material itself passes ready-mix pricing sooner than most people expect, as the example below shows.

This figure covers material cost only. It excludes excavation, a compacted gravel base, form lumber, reinforcement, finishing labor, and a pump.

As a planning rule, a professionally installed basic slab typically totals $6 to $12 per square foot. The concrete material in this calculator makes up roughly $2 to $4 of that figure.

As a concrete slab price calculator, its job is that material figure, so use it to check quotes line by line. If a bid's concrete line sits far above it, ask what else the bidder bundled in.

Formula: Cubic yards = Length × Width × Thickness (all in feet) ÷ 27 · Material cost = Cubic yards × (1 + waste %) × price per yd³ + fees

Worked Example: A 12 × 12 ft patio slab, 4 in thick

Cost steps for a 12 by 12 foot slab 4 inches thick: 1.78 cubic yards, 1.96 with waste, about $332 at $170 per yard
Material only. Delivery, short-load fees and labor are extra.
  1. Convert the thickness: 4 in ÷ 12 = 0.333 ft.
  2. Multiply: 12 ft × 12 ft × 0.333 ft = 48 ft³.
  3. Convert to yards: 48 ÷ 27 = 1.78 yd³ exact.
  4. Add 10% waste: 1.78 × 1.10 = 1.96 yd³, and 48 × 1.10 = 52.8 ft³ for the bag math below.
  5. Ready-mix: 1.96 yd³ × $170 = $332.59. The load is under most plant minimums, so add a typical short-load fee of about $75 and the delivered total is roughly $408.
  6. Bags: 52.8 ft³ ÷ 0.60 ft³ per bag = 88 × 80 lb bags. At $5.50 each that is $484, plus a mixer rental, which costs more than ready-mix even after the short-load fee.

Result: 1.78 yd³ exact, 1.96 yd³ with waste: $333 in ready-mix ($408 with a short-load fee) versus $484 in bags, so ready-mix wins at this size.

Slab material cost at $170/yd³, 4 in thick, 10% waste included

Slab sizeCubic yards with wasteReady-mix material cost
10 × 10 ft1.36 yd³$231
12 × 12 ft1.96 yd³$333
16 × 16 ft3.48 yd³$591
20 × 20 ft5.43 yd³$923
24 × 24 ft7.82 yd³$1,330

Frequently Asked Questions

How much does a concrete slab cost per square foot?

Material only, a 4 in slab at $170 per cubic yard with 10% waste costs about $2.30 per square foot. A 12 × 12 ft patio works out to $333 for 144 ft². Installed by a contractor, a broom-finished slab typically runs $6 to $12 per square foot with excavation, base, forms, reinforcement, and finishing included.

What drives the cost of a concrete slab most?

Thickness first: 6 in costs 50% more concrete than 4 in on the same area. Load size comes next: small loads attract short-load fees of $40 to $100, and a pump for poor access adds $800 to $1,200 a day. Finish type and reinforcement add more, and the ready-mix price per yard itself varies from about $150 to $200 by region.

Does this price include forms and finishing?

No, this calculator prices only the concrete material, waste, and any delivery fee you enter. Forms, excavation, gravel base, reinforcement, and finishing labor are separate costs. Together they usually make up most of an installed slab's $6 to $12 per square foot price.

How much extra does a stamped or decorative slab cost?

Stamped, colored or exposed-aggregate finishes typically bring an installed slab to $12 to $20 per square foot, versus $6 to $12 for plain broom-finished concrete. The concrete material itself barely changes; the premium is the stamping labor, release agents, integral color or admixtures, and sealing.

When do bags beat ready-mix on cost?

For pours under half a cubic yard (fence posts, an equipment pad, a repair), bags win because no minimum load or short-load fee applies. The 12 × 12 ft patio in the example needs 88 bags at $484, already more than ready-mix at about $408 delivered with fees. That total still excludes a day of mixing labor, so the real gap is wider.