Curb and Gutter Calculator
Curb and gutter is the concrete channel at the edge of a street. The flat gutter pan carries stormwater along the pavement to the inlets. The raised curb at its back holds the road edge and keeps vehicles off the shoulder and lawn.
Free · Instant results as you type · No sign-up
Live preview
Your estimate
Updates as you typeIncludes a 10% waste allowance on top of the exact geometric volume (2.78 yd³). Bag counts are rounded up, because you cannot buy part of a bag.
This concrete curb calculator treats the standard combined section, a rectangular curb on a rectangular gutter pan. It returns the concrete per linear foot, per 100 ft, and for your whole run.
The defaults match the most common municipal section in the US. You get a 6 in wide curb with a 12 in full cross-section height. It sits on a 24 in wide gutter pan 6 in thick, over a 50 ft run.
One measurement trips people up, so read this before you type. The curb height here is the full cross-section height, from the bottom of the gutter pan to the top of the curb. It is not the 6 in reveal you see above the street.
Entering the reveal instead of the full height understates the cross-section by a third.
How This Calculator Works
The math runs cross-section first and length second. The curb contributes curb width times full curb height, and the gutter contributes gutter width times gutter thickness. Add the two rectangles to get the cross-sectional area in square feet.
Multiply by the run length for cubic feet, then divide by 27 for cubic yards. For the standard section, (0.5 ft × 1.0 ft) + (2.0 ft × 0.5 ft) = 1.5 ft². Every linear foot takes 1.5 ft³, a number worth remembering when you sanity-check a quote.
Standard sections vary by city. A 6 in barrier curb has a near-vertical face and 6 in of reveal above the gutter. It is the default for residential streets.
Mountable (roll) curbs have a sloped face, so vehicles can cross them at driveways. That slope changes the cross-section and usually adds concrete. Your municipality's standard drawings, not this page, govern street work.
The drawings fix the section, the concrete strength, and joint spacing, commonly every 10 ft. They also fix whether crews measure gutter pan width from the curb face or the curb back.
Paving crews place almost all street curb and gutter with slipform machines. The machine extrudes the exact section continuously. Per-foot volumes therefore matter for bidding and truck scheduling.
Hand-forming is realistic for short runs: driveway aprons, parking lot edges, patch repairs, and private roads. If your run is a driveway apron tying into a city street, expect a permit and an inspection. Form to the city's standard section so the inspector can pass it.
Formula: Cross-section = (Curb width × Full curb height) + (Gutter width × Gutter thickness) · Volume = Cross-section × Length · Cubic yards = Cubic feet ÷ 27
Worked Example: A 50 ft run: 6 × 12 in curb, 24 × 6 in gutter
- Curb rectangle: 6 in = 0.5 ft wide, 12 in = 1.0 ft full height → 0.5 × 1.0 = 0.50 ft².
- Gutter rectangle: 24 in = 2.0 ft wide, 6 in = 0.5 ft thick → 2.0 × 0.5 = 1.00 ft².
- Cross-section: 0.50 + 1.00 = 1.50 ft², or 1.5 ft³ (0.06 yd³) per linear foot.
- Whole run: 1.50 ft² × 50 ft = 75.00 ft³ = 2.78 yd³.
- In bags, that run would take 75.00 ÷ 0.60 = 125 bags of 80 lb, so call a slipform crew or a ready-mix truck.
Result: 2.78 yd³ for the 50 ft run (1.5 ft³, about 0.06 yd³, per linear foot), before waste.
Concrete per 100 Linear Feet (6 in curb × 12 in full height, gutter varies)
| Gutter size | Cross-section | Cubic feet | Cubic yards |
|---|---|---|---|
| 18 in × 6 in | 1.25 ft² | 125.00 ft³ | 4.63 yd³ |
| 24 in × 6 in | 1.50 ft² | 150.00 ft³ | 5.56 yd³ |
| 24 in × 8 in | 1.83 ft² | 183.33 ft³ | 6.79 yd³ |
| 36 in × 6 in | 2.00 ft² | 200.00 ft³ | 7.41 yd³ |
Frequently Asked Questions
How much concrete is in one linear foot of curb and gutter?
For the standard section, the cross-section is 1.5 ft², so each linear foot takes 1.5 ft³, or 0.06 cubic yards. That section pairs a 6 in curb at 12 in full height with a 24 in by 6 in gutter pan. A narrower 18 in gutter drops the volume to 1.25 ft³ per foot, and a 36 in gutter raises it to 2.0 ft³.
How much concrete per 100 ft of curb and gutter?
With the standard 6 by 12 in curb and a 24 in by 6 in gutter, 100 linear feet takes 150 ft³. That equals 5.56 cubic yards per 100 linear feet. Add 10% waste and schedule about 6.25 yd³ per 100 ft, roughly one standard truck load per 160 ft.
What is curb reveal, and is it the height I enter?
Reveal is the part of the curb you can see above the gutter pan, typically about 6 in on a barrier curb. It is not the height to enter here, because this calculator uses the full cross-section height from pan bottom to curb top. On the standard section that height is 12 in, so entering 6 in of reveal understates your concrete by about a third.
What is the difference between barrier and mountable curb?
A barrier curb has a near-vertical face about 6 in high, and it keeps vehicles on the pavement. A mountable (roll) curb has a sloped, flattened face, so cars can cross it at driveways and parking entries. The sloped face changes the true cross-section, so take mountable dimensions from your city's standard drawing, not the barrier defaults.
Can I pour curb and gutter myself?
Yes, for short private work like a driveway apron, a parking pad edge, or a repair on your own property. You can hand-form those jobs and pour from a truck or mixer, but the wrong section means an expensive tear-out. Street curb and gutter sits in the right-of-way, follows the city's standard section, and usually requires a permit, inspection, and a licensed contractor.
Related Calculators
Helpful Guides
Concrete Bags
How Many Bags of Concrete for a 10x10 Slab? (+ Common Slab Sizes)
How many bags of concrete for a 10x10 slab? A 4 inch slab needs 56 bags of 80 lb mix, or 62 with waste. See the size chart and thickness math.
Read guideSlab & Flatwork
How to Calculate Concrete for a Slab
Calculate concrete for any slab: convert thickness to feet, multiply, divide by 27, add waste. Worked example, size chart and the subgrade mistake to avoid.
Read guideSlab & Flatwork
How Thick Should a Concrete Slab Be? (4 in vs 6 in)
Four inches for patios, 5 to 6 for driveways and garages, but base quality beats extra thickness. Thickness table, the 2x4 trap and what extra costs.
Read guide