Concrete Footing Calculator

A footing is the wide, flat base at the bottom of a foundation, and it spreads the building's load over enough soil to stop settling. This concrete footer calculator works out the concrete in a continuous strip footing from total length, footing width, and footing depth. Use it as your concrete calculator for footings of any total run: the length field takes the full trench length, corners included.

Free · Instant results as you type · No sign-up

1Dimensions

2Waste allowance

%

Pros order 5 to 10% extra for spills, over-excavation and uneven subgrade.

3Material and cost

Delivered ready-mix commonly runs $150 to $200 per yard before fees. Leave at 0 to skip cost.

Live preview

40 ft16 in8 in

Your estimate

Updates as you type
Concrete needed (cubic yards)1.45 yd³
Order this (rounded up)1.50 yd³Plants sell concrete in quarter-yard steps, so this rounds your figure up.
Volume (cubic feet)39.11 ft³
Volume (cubic meters)1.11 m³
Footprint area53.3 ft²
Waste amount0.13 yd³
80 lb66 bags
60 lb87 bags
50 lb105 bags
40 lb131 bags
Weight (at 150 lb/ft³)5,867 lb

Includes a 10% waste allowance on top of the exact geometric volume (1.32 yd³). Bag counts are rounded up, because you cannot buy part of a bag.

Footings are the one part of a concrete project you cannot fix later. The footing's bottom must sit below the frost line on undisturbed or compacted soil, and a short load delays the wall work behind it. A footing that heaves or settles telegraphs the movement straight up through the foundation wall into the framing, drywall, and roof above it.

How This Calculator Works

A continuous footing is a long rectangular box, so the volume is length × width × depth with every dimension in feet. The calculator converts width and depth from inches (16 in = 1.333 ft, 8 in = 0.667 ft), multiplies by length, and divides by 27. For a perimeter foundation, add all four sides for the length; inside corners get counted twice, and the 10% default waste allowance absorbs that overlap.

Width follows load and soil, and most residential footings land between 12 and 24 in wide on average soil. Use 12 to 16 in under a one-story wall, 16 to 20 in for two stories, and 24 in for three stories or weak soil. The footing is 8 to 12 in of concrete, but its bottom must sit below the frost line, and code wins over rules of thumb.

Footer concrete calculator or footing concrete calculator, the geometry is the same long box: a flat pad at the trench bottom below the foundation wall. Reinforce it with two continuous runs of #4 rebar held a few inches above the trench bottom, plus dowels tying it into the wall above. Order a 3,000 to 4,000 PSI mix, and dig the trench close to the design width, because each extra inch of width adds real yardage.

Formula: Volume = Length × Width × Depth (all in feet) · Cubic yards = Cubic feet ÷ 27 · Bags = Cubic feet ÷ 0.60 per 80 lb bag

Worked Example: A continuous footing 40 ft long, 16 in wide, 8 in deep

Cross-section of a strip footing 16 inches wide and 8 inches deep under a wall, with two rebar runs and its base below the frost line
The bottom of the footing sits below the frost line. Not to scale.
  1. Convert the cross-section: 16 in ÷ 12 = 1.333 ft wide, 8 in ÷ 12 = 0.667 ft deep.
  2. Multiply: 40 ft × 1.333 ft × 0.667 ft = 35.56 ft³.
  3. Convert to yards: 35.56 ÷ 27 = 1.32 yd³ of concrete.
  4. In bags, the same footing is 35.56 ÷ 0.60 = 59.3, which rounds up to 60 × 80 lb bags before waste. That is a hand-mixed pour at the practical limit, so most builders order the truck.

Result: 1.32 yd³ exact for the 40 ft footing, or 60 × 80 lb bags before waste if you mix it yourself.

Concrete per 10 Linear Feet of Footing (before waste)

Footing (width × depth)Cubic feetCubic yards
12 in × 6 in5.00 ft³0.19 yd³
16 in × 8 in8.89 ft³0.33 yd³
20 in × 10 in13.89 ft³0.51 yd³
24 in × 12 in20.00 ft³0.74 yd³

Perimeter Footing Concrete by House Size

These totals use the full outside perimeter, so corners are slightly overstated. They are exact volumes before waste and leave out any interior footings.

Foundation sizePerimeter16 × 8 in footing20 × 10 in footing
20 × 20 ft80 ft2.63 yd³4.12 yd³
24 × 24 ft96 ft3.16 yd³4.94 yd³
30 × 40 ft140 ft4.61 yd³7.20 yd³
28 × 50 ft156 ft5.14 yd³8.02 yd³

How to Measure Corners Without Double Counting

The exact run is the centerline, not the outside edge. For a rectangle measured to the outside of the footing, subtract four footing widths from the perimeter. A 30 × 40 ft footing outline, 16 in wide, has a 140 ft outside perimeter and a 134.67 ft centerline. At 8 in deep that is 4.43 yd³ instead of 4.61, so the overlap is about 4%.

You can leave the overlap in and lower the waste setting to 5 or 6%, or enter the centerline and keep 10%. For interior bearing walls, measure from the inside face of one footing to the inside face of the next.

Where Footing Width Comes From

Footing width is the load on each foot of wall divided by what the soil can carry. A wall carrying 2,000 lb per foot on soil rated at 1,500 lb per square foot needs 2,000 ÷ 1,500 = 1.33 ft, which is a 16 in footing. On soil rated at 2,000 lb per square foot, the same load works out to 12 in.

The International Residential Code lists presumptive values for use where no soil test is required: 1,500 lb per square foot for clay, 2,000 for sand and silty sand, and 3,000 for sandy gravel. It also requires exterior footings to be at least 12 in below undisturbed ground, with frost protection where frost goes deeper. Use these figures to understand a plan, and let your local code or engineer set the final size.

Concrete for Isolated Pad Footings

Posts and columns often sit on separate square pads. Each pad is length × width × depth, multiplied by the number of pads. Counts below are per pad, at 12 in deep, before waste. For round piers, use the sonotube calculator.

Pad sizeCubic feetCubic yards80 lb bags
18 × 18 in2.25 ft³0.08 yd³4
24 × 24 in4.00 ft³0.15 yd³7
30 × 30 in6.25 ft³0.23 yd³11
36 × 36 in9.00 ft³0.33 yd³15

Trench Mistakes That Change the Order

Footings poured against soil take the shape of whatever you dug. A 40 ft trench planned at 16 in but dug at 18 in takes 40 ft³ at 8 in deep instead of 35.56, which is 12.5% more. Measure the finished trench at several points and enter the averages.

Never fill an over-dug spot with loose soil, because it settles under load. Fill it with concrete and add it to the order. On a sloping site, calculate each level of a stepped footing on its own, then add the concrete that joins one level to the next.

Steel needs its own count. Two continuous bars around a 140 ft perimeter is 280 ft, and about 10% for laps makes it 308 ft, or 16 bars of 20 ft. The footing calculations guide covers size and depth, and the rebar sizing guide covers bar choice and laps.

Frequently Asked Questions

How deep do footings need to be?

The bottom of the footing must sit below the local frost line so frozen soil cannot heave it. Expect roughly 12 in in mild southern climates, 24 to 36 in mid-country, and 48 in or more in the far north. Your local code publishes the exact frost depth for your county, and the footing itself is typically 8 to 12 in thick.

What is the standard footing width for a house?

Most residential strip footings are 12 to 24 in wide and project at least 2 in beyond each face of the wall they carry. A 16 in wide × 8 in deep footing is the common default under a one- or two-story wall on average soil. Go wider, 20 to 24 in, for extra stories, heavy masonry, or soft soil with low bearing capacity.

Should I use this calculator for a deck post footing?

No: a single deck post sits on an individual pier, not a continuous strip. Use the sonotube calculator for round piers formed with cardboard tubes, or the post hole calculator for a post set directly in a dug hole. This footing calculator is for continuous runs under walls.

Do footings need rebar?

In most jurisdictions, yes: continuous wall footings typically need two continuous runs of #4 rebar near the bottom, plus vertical dowels into the foundation wall. Rebar barely changes the concrete volume, but it is not optional decoration: it carries the footing across soft spots and resists settlement cracking.

How many bags of concrete do I need for a footing?

Divide the footing's cubic feet by 0.60 for 80 lb bags. A 16 × 8 in footing takes 0.89 ft³ per foot, so 40 ft needs 35.56 ft³, or 60 × 80 lb bags before waste. Anything over about 20 linear feet of footing is usually cheaper and far faster as a ready-mix delivery.

Who Made This Calculator

Created by Roman Shah, Construction Calculator Builder and Content Specialist. Reviewed in-house by the ConcreteCalc Team for formula, units and arithmetic. The shared formulas are covered by automated tests. Found a wrong number? Report it.

Related Calculators

Helpful Guides