How-To Guides
9 guides with the numbers shown, not just the conclusions.
These step-by-step guides show the math behind common concrete jobs, from footings and walls to stairs and columns. Each guide states its formula first, then works a full example with real dimensions and numbers readers can verify by hand. Topics include footing sizing, stair volume, wall openings, beams, columns, trenches, tanks, and flowable fill for utility and backfill work.
Other guides compare bags with ready-mix trucks for small and midsize pours and explain the dry pour method in plain, direct terms. A conversions guide translates cubic yards, cubic feet, and cubic meters in both directions without rounding errors or guesswork. A mistakes guide lists the errors that waste money, so you can check your own math twice before you order.
How-To Guides
Bags vs Ready-Mix: Yards Per Truck & When to Order a Truck
A mixer truck carries 8 to 10 yards, but the real question is your size. Costed comparison at half, one, two and five yards, plus the 90-minute rule.
Read guideHow-To Guides
Concrete Volume Conversions: Yards, Feet & Meters
Convert concrete volumes fast: 1 cubic yard = 27 cubic feet = 0.765 cubic meters. Conversion table, coverage per yard and the three errors that wreck orders.
Read guideHow-To Guides
9 Concrete Calculation Mistakes That Cost You Money
Inches as feet, diameter as radius, no waste, hidden fees: nine calculation mistakes with the dollar cost of each, and a 60-second checklist before you order.
Read guideHow-To Guides
Beam & Column Concrete: Rectangular vs Circular Volume
A 12 in round column uses 21% less concrete than a 12 in square one. Volume formulas for rectangular and circular columns and beams, with worked examples.
Read guideHow-To Guides
Concrete Footing Calculations: Size, Depth & Rules
Footing math and rules together: volume per 10 feet for standard sizes, width by wall load, frost-line depth from 12 to 48 in, and the two-bars-of-rebar rule.
Read guideHow-To Guides
Concrete Stairs Explained: Rise, Run & Volume
Stair math done right: total rise divided into uniform risers (max 7.75 in), the 2R+T comfort rule, and volume by the stack-of-boxes method.
Read guideHow-To Guides
Concrete Walls With Openings: Subtracting Doors & Windows
Wall concrete = gross volume minus every door and window void at wall thickness. Two worked examples where openings save over a full yard of concrete.
Read guideHow-To Guides
Dry Pour Concrete: Method, Pros & Cons
Dry pouring skips the mixer, but tests show weaker, uneven concrete. Where it is acceptable (small pads), where it is not (driveways, footings), and the math.
Read guideHow-To Guides
Tank, Trench & Flowable Fill Basics
Trenches use length x width x depth (or average end areas when sloped); flowable fill is a 50 to 150 PSI slurry that backfills without compaction.
Read guide